• Skip to main content
  • Skip to footer
  • E-mail
  • Google+
  • LinkedIn
  • Phone
  • YouTube

Harvey Planning Consultancy

  • Services
    • Pre-Construction Planning Management
    • Project Controls During the Construction Phase
    • Forensic Schedule Delay Analysis
    • Industries
  • About
    • What We Do
    • How Does It Work?
    • Consultants
    • Client Focus
    • Operations
  • Projects
  • Reference Library
    • Work Study Introduction
    • Productivity & Production Rates
    • Earned Value Analysis
    • Forensic Schedule Delay Analysis
      • Summary of Procedures for building a claim
      • Scott Schedule
      • Construction Delay Terminology
    • Planning & Scheduling
      • Chronicle of Planning
      • History of Critical Path Method
      • Precedent Networks
      • Planning Terminology
      • Planning Hierarchy
      • Strategic and Tactical Planning
    • Procurement Routes for the Construction Industry
    • Documentation
  • Contact
    • Blog

Wind Farms

A wind farm or wind park, also called a wind power station or wind power plant, is a group of wind turbines in the same location used to produce electricity. Wind farms vary in size from a small number of turbines to several hundred wind turbines covering an extensive area. Wind farms can be either onshore or offshore.

The two most abundant forms of power on earth are solar and wind, and they are getting cheaper and cheaper.

The Construction Life Cycle of a Wind Farm

Site selection and feasibility

Scoping and consultation

Planning application and consenting

Construction

Operation and maintenance

Project Life Cycle Programme

Footer

Based in Chester and North Wales

Tel: 0800 043 4370

Email: hpc@harveypc.co.uk

  • E-mail
  • Google+
  • LinkedIn
  • Phone

Harvey Planning Consultancy Ltd

Registered in England Company No. 13217849

VAT Registration Number – 376 1614 87

Terms and Conditions

 

Copyright © 2025 ·Harvey Planning Consultancy Ltd · Site by Maloney IT